MK Global Industrial Center, VSIP Bac Ninh II IP
19,164 m² factory & office leasing complex at VSIP Bac Ninh II IP (4 buildings X1–X4) — open for lease. Built for FDI, logistics and manufacturing tenants that need a tighter supply chain, fast access to Noi Bai Airport, Hai Phong Port and cross-border trade with China.
Operating information
- MK Global Industrial Center sits inside VSIP Bac Ninh II Trade & Services IP, on the Hanoi – Hai Phong – China economic corridor. Current built area is 19,164 m², part of a phased master plan expandable across 3 stages to absorb diverse investment scales.
- The location optimises trade lead time: fast connectivity to Noi Bai Airport, Hai Phong Port, and the cross-border trade lanes with China — ideal for FDI, logistics and manufacturing tenants that want to shorten their supply chain.
- Flexible lease policy with a 3-year minimum term and a fixed rent for the first year. The developer offers 1 month rent-free starting from the date the tenant receives both IRC and ERC.
- Modern 2-storey ready-built infrastructure: blocks X1, X2 and X3 deliver 7,882.5 m² of total floor area, and block X4 delivers 8,076 m². The production area has a 16.25 m clear ceiling, 3 t/m² load capacity on the ground floor and 1 t/m² on the upper floor. The approved standard Sprinkler fire-safety system is in place.
- Full-package legal support for FDI tenants: the developer provides free assistance with the Investment Registration Certificate (IRC) and Enterprise Registration Certificate (ERC), accelerating factory set-up.
Technical specifications
Scale
- Total land area
- 19,164 m²
- Number of factories
- 4 units (X1–X4)
- Number of storeys
- 2 storeys
- Floor area X1+X2+X3
- 7,882.5 m²
Connectivity
- Floor area X4
- 8,076 m²
- Production clear height
- 16.25 m
- Ground-floor load
- 3 t/m²
- Upper-floor load
- 1 t/m²
Operations
- Fire safety
- Standard Sprinkler (approved)
- Lease term
- From 3 years
- Incentive
- 1 month free after IRC/ERC
- FDI legal support
- Free IRC + ERC
Site location
Related facilities
Facilities that may fit

DEEP C Hai Phong II — Industrial Land
Industrial land for lease at DEEP C Hai Phong II — 641 ha within the DEEP C cluster (~3,400 ha) inside Dinh Vu – Cat Hai EZ. Land use right to 06/05/2059. Top-tier CIT incentives, direct connectivity to Lach Huyen Port, Cat Bi Airport and the HN – HP – QN expressway.
- Port
- Lach Huyen + Dinh Vu Port (within the EZ)
- Airport
- Cat Bi International Airport

Trang Due Industrial Park, Hai Phong
79,091 m² factory and office leasing complex at Trang Due IP — 100% occupied. Ready for the next expansion phase, serving FDI manufacturers that need fast connectivity to Lach Huyen Port and the Hanoi – Hai Phong Expressway.
- Port
- 15 km to Lach Huyen Port
- Airport
- 14 km to Cat Bi Airport